Bid lists · updated Nov 2 · next update Dec 3 · links checked November 3, 2026
How to get on the FortisBC bid list
FortisBC is the owner or proponent of 2 projects we track: Tilbury Phase 2 LNG, Eagle Mountain–Woodfibre Gas Pipeline (EGP). Register on its supplier page, watch BC Bid, and get in front of the contractors that let the subcontracts. Stage and stated timing below are as of November 2, 2026.
1. Register on the FortisBC supplier page
FortisBC: work with us. This is the owner’s own page for suppliers and contractors. Check what it asks for (registration, prequalification or a contact) and keep your details current.
2. Watch the public tender portal
Public tenders in British Columbia are posted on BC Bid.
3. Get in front of the contractors
On projects this size, much of the work is subcontracted by the EPC or prime contractors, so their supplier lists matter as much as the owner’s. The contractor teams on these projects are in the subscriber brief.
FortisBC projects we track
| Project | Location | Stage | Stated timing | Contractors, bid packages |
|---|---|---|---|---|
| Tilbury Phase 2 LNG | Delta | Proposed / pre-FID | Construction start: Early 2027 (tank, targeted); In service: Six-year build | Subscribers |
| Eagle Mountain–Woodfibre Gas Pipeline (EGP) | Coquitlam to Squamish (Howe Sound) | Late construction / commissioning | Construction start: August 2023; In service (owner target): 2026–2027 | Subscribers |
Subscriber detail
- Contractor teams and EPC primes Subscribers
- Dated bid packages and the next milestone Subscribers
- Buyer contacts Subscribers
All owner bid list pages · How to get on bid lists (guide) · Bid calendar
Frequently asked
How do I become a supplier to FortisBC?
Start with the FortisBC supplier page (FortisBC: work with us). Public tenders in British Columbia are on BC Bid. On large projects, also prequalify with the EPC and prime contractors.
Which FortisBC projects are you tracking?
Tilbury Phase 2 LNG: proposed / pre-fid; Eagle Mountain–Woodfibre Gas Pipeline (EGP): late construction / commissioning (as of November 2, 2026).
Who are the contractors on FortisBC projects?
The contractor teams, dated bid packages and buyer contacts are in the subscriber brief: C$39 a month or C$299 a year.