Free · updated October 12, 2026

Western Canada major projects tracker

The 22 industrial, energy and data-centre projects we track in British Columbia, Alberta and Saskatchewan: owner, status, next milestone and disclosed cost. Click a project for its contractors, schedule and sources.

22projects tracked
59sources cited
C$129B+disclosed Canadian-dollar capex
3provinces
22 projects
ProjectProvinceSectorStatusNext milestoneDisclosed cost
LNG Canada Phase 2B.C.LNGFID Sep 28, 2026; early works since Oct 1~4 months of early works, then full construction~C$33B private investment (federal estimate)
Coastal GasLink Phase 2B.C.PipelineProceeding; conditions met Sep 29Construction early 2027; in service early 2030s—
Cedar LNGB.C.LNGPipeline welded; FLNG >50%Ledcor handover Oct 2026; startup late 2028US$4.0B total (US$3.4B capital)
Ksi Lisims LNG + Prince Rupert Gas Transmission (PRGT)B.C.LNG + pipelinePre-FIDFID targeted by end-2026; construction early 2027 if approvedC$30B facility (federal 2026 figure) + C$10–12B PRGT
Woodfibre LNGB.C.LNG~65% completePipe installation in tunnel; first cargo targeted Dec 2027US$8.8B
North Coast Transmission Line (NCTL)B.C.PowerPhase 1 clearing since July; four line teams shortlistedOct 15 final draft contract · Dec 15 proposals · May 2027 awardC$6B (Phases 1–2, BC Hydro estimate); C$3.9B federal–provincial commitment
Tilbury Phase 2 LNGB.C.LNGB.C. EA certificate and federal decision, both Sep 21Remaining permits; owner investment decisionC$3.1B (FortisBC projection)
Red Chris block cave and Eskay CreekB.C.Mining—Red Chris FID later this year · Eskay power late Nov, first ore Q2 2027Red Chris ~C$3B (Newmont); Eskay Creek US$659M (2026 update)
Pacific Link oil pipelineAlbertaPipelineListed Oct 1 under the Building Canada ActMPO conditions document; earliest start Sep 1, 2027C$35.2–43.7B (preliminary, incl. contingency)
Dow Path2ZeroAlbertaPetrochemicalConstruction proceeding after the 2025 pausePhase 1 late 2029; Phase 2 end of 2030~US$7.5B
Cenovus Christina Lake interconnectAlbertaOil sandsAER notice Sep 15Statement-of-concern deadline Oct 15; construction mid-2027; startup Q4 2028—
Fall oil sands and refinery turnaroundsAlbertaTurnarounds—Spring 2027 turnaround planning—
Alliance Heartland Expansion and Pathways CCSAlbertaGas pipeline + CCS—Alliance construction Apr 2028–Sep 2030 (CER page)Alliance not disclosed; Pathways phase 1 C$20–30B (reported)
BHP Jansen potash mineSaskatchewanMiningStage 1 84% complete · Stage 2 16%First production mid-calendar 2027Stage 1 US$8.4B; Stage 2 US$6.9B
Meta data centre, Sturgeon CountyAlbertaData centreGround broken Jul 8, 2026Load in service back half of 2028>C$13B
Greenlight Electricity CentreAlbertaGas powerFID Jul 2; all major approvals in handIn service H2 2030~C$4.6B incl. financing
Capital Power supply to Meta / GeneseeAlbertaPower supply—Load in back half of 2028—
Keephills data centre (TransAlta)AlbertaData centreNon-binding MOU, Feb 27, 2026Definitive agreements and a ~230 MW PPA—
Beacon AI Centers (Heartland and Indus)AlbertaData centre + gas—AUC decisionsUp to US$7.2B across the Alberta portfolio
Wonder Valley data centreAlbertaData centreProposed; EPEA and Water Act approvals outstandingPermit applications and decisionsProponent claims ~C$70B at full build
Bell AI Fabric Hillside AI Centre, KamloopsB.C.Data centreConstruction since spring 2026Completion late 2027—
Bell AI Fabric, Regina areaSaskatchewanData centre + gas300 MW under construction (RM of Sherwood); +900 MW non-binding MOUTenant commitments, a power partner, EAs~C$1.7B for the 300 MW phase; >C$50B for the 1.2 GW expansion (provincial figure)

Costs as published by the owner or government, in the currency published. “—” means no figure has been released. Research cut-off October 12, 2026.

Browse by province

British Columbia (9)Alberta (11)Saskatchewan (2)

Browse by sector

LNG (5)Pipelines (3)Power and transmission (3)Data centres (6)Mining (2)Oil sands and petrochemicals (3)

Policy, grid and market context this month

  • B.C. provincial election (Oct 24): The election pause: B.C. votes Oct 24.
  • AESO large-load integration: Large-load integration: Phase 1 is full, Phase 2 is still on hold.
  • Alberta data-centre levy (Bill 12): The data-centre levy (Bill 12) applies from Dec 31, 2026.
  • Bill impact of bridging load (Pembina Institute): Pembina Institute: bridging load could raise Alberta bills.
  • BC Hydro 2026 Call for Demand: 2026 Call for Demand: about 2:1 oversubscribed and paused for the election.

The full brief is in the October 2026 report: the procurement packages to watch, the buyer and contractor contacts, the dates on the 90-day calendar and how this project ties into the rest of the pipeline.

Read it for C$299 a year or see a free sample