British Columbia · Power · updated October 12, 2026
BC Hydro 2024 and 2025 calls for power
14 wind and solar projects with First Nations equity add 8,500 GWh a year by 2033.
- Province
- British Columbia
- Location
- Northern B.C. and southern Interior
- Sector
- Power
- Owner
- BC Hydro (independent power producers)
- Status
- 2024 call: 10 EPAs (nine wind, one solar), about 4,830 GWh/yr. 2025 call: four projects, about 3,500 GWh/yr, announced May 2026
- Next milestone
- Permitting; BC Hydro interconnection work from 2027; projects online from 2030–2033
- Disclosed cost
- C$4.3B private investment (2025 call, Province) (source)
- In service
- 2030–2033
- Other details
- All 2025-call projects carry 51% First Nations equity
Why it matters for contractors and suppliers
Turbine foundations, roads, collector systems and substations for 14 projects will be tendered by the independent power producers from about 2027.
Want to know when BC Hydro 2024 and 2025 calls for power moves? Status changes, contract awards and tender dates for every tracked project go to subscribers in the mid-month update, alongside the two monthly reports.
Subscribe for C$299 a year or get the free Top 25 PDF
C$24.92 a month, billed yearly. Cancel any time in two clicks.
Free vs full reports
| Free | Full reports C$299/yr or C$39/mo | |
|---|---|---|
| Project tracker: owner, status, next milestone, cost | ✓ | ✓ |
| Monthly front pages and headlines by email | ✓ | ✓ |
| Free Top 25 Projects one-pager | ✓ | ✓ |
| Both full monthly reports (21 pages in October 2026) | – | ✓ |
| Procurement packages and buyer and contractor contacts | – | ✓ |
| Bid calendar: tenders, awards and deadlines, exportable to Outlook or Google | – | ✓ |
| Project watchlist, highlighted in the mid-month update | – | ✓ |
| Mid-month update when tracked projects move | – | ✓ |
| Every past issue in your account | – | ✓ |
| Get the free PDF | Subscribe |
C$24.92 a month billed yearly (save 36%). Cancel any time in two clicks.
Sources
Supplier registration: B.C. public tenders. How we research: editorial standards.
Frequently asked
What is the status of BC Hydro 2024 and 2025 calls for power?
As of October 12, 2026: 2024 call: 10 EPAs (nine wind, one solar), about 4,830 GWh/yr. 2025 call: four projects, about 3,500 GWh/yr, announced May 2026. Next: Permitting; BC Hydro interconnection work from 2027; projects online from 2030–2033.
Who owns BC Hydro 2024 and 2025 calls for power?
BC Hydro (independent power producers).
How much does BC Hydro 2024 and 2025 calls for power cost?
C$4.3B private investment (2025 call, Province).
What is the timeline for BC Hydro 2024 and 2025 calls for power?
In service: 2030–2033.