Alberta’s largest projects in 2026: petrochemicals and carbon capture in the Industrial Heartland, oil sands, Calgary and Edmonton LRT, and the data-centre and gas-power build, each linked to its primary source.

Alberta has the widest spread of project types in the West. Dow’s Path2Zero and Shell’s Polaris CCS keep the Heartland busy. Calgary’s Green Line has C$6.2B committed and its station, track and systems contracts are coming to market. Data-centre proposals tied to on-site gas power are the newest source of work, and the slowest to firm up. Grid connection and power supply decide which of them get built.

In this guide

  1. Pacific Link oil pipeline
  2. Dow Path2Zero
  3. Cenovus Christina Lake interconnect
  4. Fall oil sands and refinery turnarounds
  5. Alliance Heartland Expansion and Pathways CCS
  6. Meta data centre, Sturgeon County
  7. Greenlight Electricity Centre
  8. Capital Power supply to Meta / Genesee
  9. Keephills data centre (TransAlta)
  10. Beacon AI Centers (Heartland and Indus)
  11. Wonder Valley data centre
  12. Calgary Green Line LRT (SE)
  13. Valley Line West LRT
  14. Shell Polaris CCS and Atlas hub
  15. Scotia Place event centre
  16. ATCO Yellowhead Mainline
  17. Air Products net-zero hydrogen complex
  18. eStruxture CAL-3 data centre
  19. TNE / Data District data centres (Phase 1)
  20. Crusoe AI data centres with Kalina gas power
  21. Canadian Natural growth projects (on hold)
  22. Suncor Base Mine Extension (proposed)

Alberta · Pipeline · Bruderheim–Delta

Pacific Link is now a national-interest project; construction is at least a year out.

  • Status: Listed Oct 1 under the Building Canada Act
  • Next: MPO conditions document; earliest start Sep 1, 2027
  • Disclosed cost: C$35.2–43.7B (preliminary, incl. contingency)
  • Owner: Trans Mountain Corp. and APMC (equal); Pembina 10%, plus up to 10% more at COD
  • In service: 2032–2034

Sources:

Dow Path2Zero

Alberta · Petrochemical · Fort Saskatchewan

Dow Path2Zero is back on, with startup in late 2029.

  • Status: Construction proceeding after the 2025 pause
  • Next: Phase 1 late 2029; Phase 2 end of 2030
  • Disclosed cost: ~US$7.5B
  • Owner: Dow
  • In service: Phase 1 late 2029; Phase 2 end-2030

Sources:

Cenovus Christina Lake interconnect

Alberta · Oil sands · Christina Lake

Cenovus files to connect Christina Lake and Christina Lake North.

  • Status: AER notice Sep 15
  • Next: Statement-of-concern deadline Oct 15; construction mid-2027; startup Q4 2028
  • Disclosed cost: Not publicly disclosed
  • Owner: Cenovus (including former MEG assets)

Sources:

Fall oil sands and refinery turnarounds

Alberta · Turnarounds · Fort McMurray and Edmonton

Fall turnaround season ends this week.

  • Status: —
  • Next: Spring 2027 turnaround planning
  • Disclosed cost: Not publicly disclosed
  • In service: Spring 2027 planning

Sources:

Alliance Heartland Expansion and Pathways CCS

Alberta · Gas pipeline + CCS · Heartland

Alliance Heartland Expansion reaches the CER; Pathways still has no FID.

  • Status: —
  • Next: Alliance construction Apr 2028–Sep 2030 (CER page)
  • Disclosed cost: Alliance not disclosed; Pathways phase 1 C$20–30B (reported)
  • In service: Alliance Sep 2030

Sources:

Meta data centre, Sturgeon County

Alberta · Data centre · Sturgeon County

Meta's first Canadian data centre: 1 GW, >C$13B, under way.

  • Status: Ground broken Jul 8, 2026
  • Next: Load in service back half of 2028
  • Disclosed cost: >C$13B
  • Owner: Meta Platforms
  • In service: Back half of 2028

Sources:

Greenlight Electricity Centre

Alberta · Gas power · Sturgeon County

Greenlight Electricity Centre: Alberta's first dedicated data-centre power plant.

  • Status: FID Jul 2; all major approvals in hand
  • Next: In service H2 2030
  • Disclosed cost: ~C$4.6B incl. financing
  • Owner: Pembina 47.5% · Morgan Stanley Infrastructure 47.5% · Kineticor 5%; Contractors: Aecon + Técnicas Reunidas (fixed price) · Siemens Energy
  • In service: H2 2030

Sources:

Capital Power supply to Meta / Genesee

Alberta · Power supply · Edmonton

Capital Power bridges Meta to 2030 and pitches Genesee to the next hyperscaler.

  • Status: —
  • Next: Load in back half of 2028
  • Disclosed cost: Not publicly disclosed
  • Owner: Meta Platforms
  • In service: Back half of 2028

Sources:

Keephills data centre (TransAlta)

Alberta · Data centre · Parkland County

Keephills: an AESO allocation in hand, but no binding deal yet.

  • Status: Non-binding MOU, Feb 27, 2026
  • Next: Definitive agreements and a ~230 MW PPA
  • Disclosed cost: Not publicly disclosed
  • Owner: TransAlta (site and power) · CPP Investments and Brookfield

Sources:

Beacon AI Centers (Heartland and Indus)

Alberta · Data centre + gas · Heartland

Beacon AI Centers waits on the AUC for two gas plants.

  • Status: —
  • Next: AUC decisions
  • Disclosed cost: Up to US$7.2B across the Alberta portfolio

Sources:

Wonder Valley data centre

Alberta · Data centre · MD of Greenview

Wonder Valley: zoning help, but no permits yet.

  • Status: Proposed; EPEA and Water Act approvals outstanding
  • Next: Permit applications and decisions
  • Disclosed cost: Proponent claims ~C$70B at full build

Sources:

Calgary Green Line LRT (SE)

Alberta · Transit · Calgary (southeast)

C$6.2B committed, with station, track and systems contracts coming to market.

  • Status: Seven construction projects active; eight contracts worth more than C$200M awarded since June 2025
  • Next: Bow River and Shepard–Bow civil packages, track, comms and traction power, and signalling RFPs through 2026; station contracts later in 2026, built from 2027
  • Disclosed cost: C$6.248B committed (three governments)
  • Owner: City of Calgary; Contractors: Graham (78 Ave LRT bridge), EllisDon (Blackfoot Trail LRT bridge), North Star Contracting (Ogden Road), plus PCL and Supreme Steel (maintenance facility)
  • In service: 2031 (SE segment)

Sources:

Valley Line West LRT

Alberta · Transit · Edmonton (downtown to Lewis Farms)

A C$2.6B, 14 km LRT line, 68.7% built and on budget.

  • Status: 68.7% complete at end of Q2 2026 (independent certifier); on budget
  • Next: Construction complete 2028, then testing and commissioning
  • Disclosed cost: C$2.6B (City project budget)
  • Owner: City of Edmonton; Contractors: Marigold Infrastructure Partners (Colas, Parsons, Standard General, Stantec and others); LRVs from Hyundai Rotem (46)
  • In service: After 2028 (date not set)

Sources:

Shell Polaris CCS and Atlas hub

Alberta · Carbon capture · Scotford, Strathcona County

Shell's second Scotford carbon-capture plant, capturing 650,000 t a year, builds toward 2028.

  • Status: Under construction (Alberta Major Projects); Shell projected a peak of about 400 workers in Q4 2025–Q1 2026
  • Next: Operations toward the end of 2028
  • Disclosed cost: Not publicly disclosed
  • Owner: Shell Canada (Polaris 100%); Atlas hub 50/50 with ATCO EnPower
  • In service: Toward end of 2028

Sources:

Scotia Place event centre

Alberta · Buildings · Calgary (Rivers District)

Calgary's C$926M event-centre block is building toward a fall 2027 opening.

  • Status: Under construction since January 2025 (foundations first)
  • Next: Opening fall 2027
  • Disclosed cost: C$926.4M initial investment (City, Province, CSEC partners)
  • Owner: City of Calgary
  • In service: Fall 2027

Sources:

ATCO Yellowhead Mainline

Alberta · Pipeline · Peers to Fort Saskatchewan

A C$2.9B, 235 km, 1 Bcf/d gas pipeline feeding the Heartland broke ground in Sept 2026.

  • Status: Final AUC approval July 2026; ground broken Sept 2026
  • Next: Operational Q4 2027
  • Disclosed cost: C$2.9B (Alberta Major Projects)
  • Owner: ATCO (Canadian Utilities)
  • In service: Q4 2027

Sources:

Air Products net-zero hydrogen complex

Alberta · Hydrogen · Edmonton (Industrial Heartland)

A C$4.6B hydrogen and liquefaction complex with carbon capture, due 2027.

  • Status: Under construction (Alberta Major Projects)
  • Next: Completion 2027 (provincial schedule)
  • Disclosed cost: C$4.6B (Alberta Major Projects)
  • Owner: Air Products
  • In service: 2027

Sources:

eStruxture CAL-3 data centre

Alberta · Data centre · Rocky View County (Calgary)

Alberta's largest colocation build: a 90 MW, Tier III, C$750M AI-ready campus.

  • Status: Under construction (Alberta Major Projects, 2024–2026)
  • Next: Phase 1 online in 2026
  • Disclosed cost: C$750M (Alberta Major Projects)
  • Owner: eStruxture
  • In service: 2026

Sources:

TNE / Data District data centres (Phase 1)

Alberta · Data centre · Olds, Bonnyville, Calgary and Edmonton regions

Four data centres totalling 240 MW and C$1.26B; Olds first in 2026.

  • Status: Proposed (Alberta Major Projects)
  • Next: Olds construction 2026; Bonnyville 2027
  • Disclosed cost: C$1.26B (four sites)
  • Owner: Technologies New Energy and Data District

Sources:

Crusoe AI data centres with Kalina gas power

Alberta · Data centre · Brazeau, Red Deer and Rocky View counties

Crusoe plans gas-powered AI campuses at 170 MW Kalina energy parks, C$3B in total.

  • Status: Proposed (Alberta Major Projects)
  • Next: Power plant and site approvals
  • Disclosed cost: C$3B (about C$1B per 170 MW plant)
  • Owner: Crusoe (power: Kalina Distributed Power)

Sources:

Canadian Natural growth projects (on hold)

Alberta · Oil sands · Athabasca region

Pike 2, Jackfish and a new Jackpine mine wait on federal–Alberta agreements due November 2026.

  • Status: On hold until definitive Oil Sands Alliance–Alberta–federal agreements are finalized
  • Next: Agreements targeted November 2026
  • Disclosed cost: Not publicly disclosed
  • Owner: Canadian Natural Resources

Sources:

Suncor Base Mine Extension (proposed)

Alberta · Oil sands · North of Fort McMurray

A proposed 225,000 bbl/d mine to replace Base Plant supply.

  • Status: Early development; project descriptions filed with the AER and Impact Assessment Agency
  • Next: Impact assessment; Suncor choosing among supply options
  • Disclosed cost: Not publicly disclosed
  • Owner: Suncor Energy

Sources:

Frequently asked

Where are Alberta public tenders posted?

Alberta Purchasing Connection (purchasing.alberta.ca). The cities of Calgary and Edmonton and private owners post through their own supplier pages.

Which Alberta projects have the most work to tender in 2026–27?

The Calgary Green Line (stations, guideway, track and systems), the Edmonton Heartland petrochemical and CCS builds, and data-centre campuses whose power deals have closed.

The full brief is in the October 2026 report: the procurement packages to watch, the buyer and contractor contacts, the dates on the 90-day calendar and how this project ties into the rest of the pipeline.

Read it for C$299 a year or see a free sample

Cancel any time in two clicks.